WATER RESOURCES ASSESSMENTS
Water Availability Assessment for the Lunsemfwa Catchment
In this project an analysis was performed to determine if there was enough water to support an irrigation scheme in the upper Lunsemfwa Catchment in Zambia. The project was being developed by Nordzuker. The analysis yielded significant impacts on downstream users including the Lunsemfwa hydropower scheme and infrastructure interventions to ameliorate yield impacts were considered too expensive to support the irrigation water requirements.
Client
Country
Duration
Imagen Consulting Ltd./ Nordzuker
Zimbabwe
2014 - 2015
Initial water quality impact assessment of the extensions to the Maputo Water Treatment Works on the Mbuluzi river
Initial water quality impact assessment of the extensions to the Maputo Water Treatment Works on the Mbuluzi river
Client
Country
Duration
Impacto/Maputo Water Treatment Works
South Africa
2008 - 2008
Annual Operating Analysis Letaba River Catchment
Full annual operating analysis for the Letaba catchment looking at water availability short term for drought management conditions using a water resources modelling framework. Comparing several models for the application in South Africa.
Client
Country
Duration
Letaba River Catchment
South Africa
2005 - 2006
Implementation phase: Framework for the Development of a Formal Classification System for Water Resources, for the DWAF: RDM
In this project a framework was set in place to develop a classification system for RDM based on the National Water Act of 1998. The system was established, and the framework used to inform later work on the development of an generic framework for the classification of Water Resources in South Africa.
Client
Country
Duration
DWAF: Resource Directed Measures
South Africa
2004 - 2005
Inception phase: Framework for the Development of a Formal Classification System for Water Resources, for the DWAF: RDM
Researched and development of a Classification System for water resources in South Africa. This framework system was developed for implementation based on current literature and the National Water Act of 1998. A risk-based classification was developed that balanced the need to implement the reserve against environmental impacts and impacts on Water Users.
Client
Country
Duration
DWAF: Resource Directed Measures
South Africa
2003 - 2004
Assessing the hydro-institutional options available to license water use activities, with a particular focus on irrigation and forestry licenses, using the Mike Basin Water Resources Planning Model
Looking at specific options related the hydrological and water resources implementations. Assessing the feasibility of different licensing conditions and the practically of implementing these systems in an operational framework.
Client
Country
Duration
Water Research Commission (WRC)
South Africa
2003 - 2003
The development of a computerized system for auditing real time historical water use from large reservoirs in order to promote the efficiency of water use from the reservoirs (WRC)
Developed a system which was used to setup different institutional arrangements in a reservoir. These included user specific curtailments and water banking. The system was then used to test specific institutional arrangements from a human behaviour and resource economics perspective.
Client
Country
Duration
Water Research Commission (WRC)
South Africa
2002 - 2004
Scoping exercise of the Usuthu-Mhlathuze Water Management Area (WMA) on behalf of the DWAF Strategic Environmental Assessment Team.
Perform an initial high level scoping exercise for the Usuthu-Mhlathuze WMA. This included the collection of GIS and water related data such as weirs and flow records, rainfall information and various other biophysical indicators to include in an initial report.
Client
Country
Duration
DWAF
South Africa
2001 - 2001